Small & Co Welcomes the Putford Artemis

Numerous Repairs For Putford Vessel in Lowestoft

The vessel was docked on 19/06/2012 for steel and piping repairs to skeg tank and No. 3 tank. Crack repairs were carried out to Kort nozzle, hull plating at steering flat, with temporary repairs carried out to funnel.

A new navigation light pedestal and platform was manufactured and fitted to the vessel. Additionally one Starboard and two Port propeller blades were removed with repairs and adjustments made. The blades were then re-fitted to vessel with Artemis being released on 22/06/2012.

Small & Co Steel and Piping Ship Repairs