Repairs Carried Out on Putford Athena

A number of repairs and inspections were carried out on the Putford Athena Cargo by Small & Co

The Vessel was docked for inspection from the 17/10/2011 and repairs to port and starboard main engine gearboxes were carried out.

Other repairs carried out included the port funnel, damaged areas of shell plating, and skeg tank, with general deck repairs being carried out at the same time.

Guards were fabricated for both the aquamaster coupling and bowthrust coupling, and the propellors were removed for repairs to their blades.

The vessel was undocked on 20/10/2011.