Putford Worker Dry Docked For Repairs

First built in 1976, the Putford Worked was dry docked by Small & Co for inspections and repairs.

The Vessel was docked for inspection on 24/10/2011 and repairs to her Tailshaft, Rudder Calibrations were carried out. Propulsion and Tailshaft Weardown Measurements were also taken. Suction, Storm and Overboard Valves were removed, dismantled and surveyed for class, and an Overboard Valve changed out.

Repairs were made to Port and Starboard no. 19 Tanks.

The vessel was undocked on 26/10/2011