Browsing articles from "October, 2011"
Leg Repairs to Deep Diver 1
Fugro Seacore’s second largest Jack Up Barge, Deep Diver 1 arrived at Lowestoft for repairs to the barges legs
The barge arrives on 02/10/2011 for repairs to its legs. They were lifted from their positions on the barge on Saturday 08/10/2011 by crane and laid out on the yard ready for repairs to be carried out. The barge sailed from lowestoft on 28/10/2011.

Latest News
-
Putford Artemis In For Repairs & Painting
21 Dec 2011
-
Atlantic Surveyor in Small & Co Dry Dock
12 Dec 2011
-
Culex Tanker Transformed in Dry Dock
9 Dec 2011

